Factors Causing the Delay of Foundation Work for Residential Building Projects in the Bangkok Metropolitan Region
Main Article Content
Abstract
The paper aims are 1) to identify the major factors causing the delay in foundation construction process of residential buildings in the Bangkok Metropolitan Region (BMR); 2) to explore the relationships among these influencing factors; and 3) to propose guidelines to mitigate the aforementioned delay.The sample consisted of 376 key players involved in construction projects, including supervisors, construction engineers, project managers and project executives. A questionnaire served as the quantitative data collection tool. Statistical methods for analyzing data were mean, standard deviation, p-value analysis, risk percentage, correlation coefficient, and confirmatory factor analysis.
As results, 1) The most important factor affecting the delay was pile foundation construction process, followed by site preparation, foundation concrete casting, plugging holes and concrete foundation leveling, alongside foundation excavation and and backfilling respectively; 2) The model reveals that factors involving the delay comprised 6 components and 21 variables. The most significant factor was the foundation of concrete casting, containing 4 principal variables, i.e. site access, formwork installation, severe weather conditions, and reinforcement laying; 3) With regard to the guidelines on delay-avoidance practices from the construction personnel’s perspectives, special emphasis should be placed on these aspects: site supervisory qualities regarding job readiness, attention to detail, meticulousness at work, skills in supervising the preparation of construction materials and equipment, as well as preparedness and monitoring of severe weather conditions that can affect construction projects and future delays.
Article Details

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
References
Magar, J. S., Kudtarkar, A., Pachpohe, J., and Nagargoje, P. (2020). Study and Analysis of Types of Foundation and Design Construction. International Research Journal of Engineering and Technology, 7(1), pp. 3301-3307.
Triwong, T., Yamoat, N., and Pongsuwan, A. (2022). Factors Affecting Delay of Construction Projects. RMUTP Research Journal, 16(2), pp. 127-140.
Boonchan, K. and Methakullachat, D. (Feb 5-7, 2020). The Factors Affecting Delays of Construction Projects: A Cace Study of Department of Public Works and Town Planning of Samut Sakhon Province. In The Proceedings of the 58th Kasetsart University Annual Conference (pp. 406-415). Bangkok: Kasetsart University.
Kongsong, W. and Pooworarulchai, C. (2019). Cause of Delay in the Construction Project by Relative Importance Index Method. The Journal of KMUTNB., 29(2), pp. 270-281.
National Statistical Office. (2024). Compilation of Construction Area Data, 1st Quarter 2024. Bangkok: National Statistical Office.
Yamane, T. (1973). Statistics: An Introductory Analysis (3rd ed.). New York: Harper and Row.
Silpcharu, T. (2024). Statistical data analysis and research by SPSS and AMOS (18th ed.). Bangkok: S. R. Printing Massproducts.
Likert, R. (1932). A technique for the measurement of attitudes. Archives of psychology, 140, pp. 1-55.
Poklang, J. (2016). Factors Affecting Delay of Piling in Rice Seed Center Construction. Master thesis, M.Eng., Suranaree University of Technology, Nakhon Ratchasima.
Gaskin, J. and Lim, J. (2016). Model Fit Measure., AMOS Plugin. Gaskination's StatWiki.
Kilic, A., Uysal, I. and Atar, B. (2020). Comparison of Confirmatory Factor Analysis Estimation Methods on Binary Data. International Journal of Assessment Tools in Education, 7(3), pp. 451-487.
Hair, J. F., Black, W. C., Babin, B. J. and Anderson, R. E. (2019). Multivariate Data Analysis (8th ed). New Jersy: Upper Saddle River.
Henindia, R. and Suroso, A. (2022). Analysis of the Factors Causing Delay in Pile Foundation Work for Medium-Story Building Project. Journal of Applied Science, Engineering, Technology, and Education, 4(1), pp. 27-38.
Shui, S., Rifai, A. and Pamadi, M. (2023). The Analysis Performance of Project Delays in Pile Foundation Work. International Journal of Entrepreneurship and Business Development, 6(1), pp. 172-182.